top of page
JFK # E-1B.jpg
JFK # E-2.jpg

PROJECT: CENTRAL SUBSTATION 2

LOCATION: JFK INTERNATIONAL AIRPORT

TYPE: NEW CONSTRUCTION

CLIENT: PORT AUTHORITY NY&NJ

TONAB provided architectural services for the design of a new electric substation at JFK Airport. The project was delivered with TONAB as architect-of-record and subconsultant to Syska Hennessy Group, with design-build led by Yonkers General Contracting.

The Substation is designed to house transformers, switchgear, and essential auxiliary support spaces within a resilient and efficient layout. Architecturally, the building envelope incorporates insulated metal panels and complementary metal cladding that align with the design vocabulary of the adjacent building, the New Terminal One, providing visual continuity across the campus. The substation is LEED certified and features a green roof system.

JFK # E-7.jpg

Contact Us

Manhattan, NY
Address
111 John Street,
Suite 1560

New York, NY 10038

Tel
+1 (212) 674-2890

Queens, NY
Address
35-01 36th Avenue,
5th Floor
Astoria, NY 11106

Tel
+1 (929) 480-7500

Newark, NJ
Address
One Gateway Center,
Suite 2600
Newark, NJ 07102

Tel
+1 (973) 618-7949

E-mail:

info@tonab.com

  • Instagram
  • LinkedIn

© TONAB | architecture pllc

bottom of page