top of page
151118_PS99_0011.JPG
151118_PS99_0016.JPG

PROJECT: PS 99 

LOCATION: BROOKLYN, NY

TYPE: BUILDING RESTORATION

COST:  $2,500,000

This Plaza deck, used as the school playground, was leaking in occupied spaces below to the extent that buckets were catching water in the Cafeteria below.  The design team specified removal 100% of the existing concrete and defective membrane, removal of ceilings below, repair of damaged and leaking pipes, new ceilings, and new concrete plaza deck to be used as the school playground.

151118_PS99_0005.JPG